Flynn removed an existing BUR and installed new 2-ply modified bitumen cold-applied. The sweltering heat and the cramped roof made the highly detailed work difficult, but the team persevered in updating the century-old church.
Flynn removed an existing BUR and installed new 2-ply modified bitumen cold-applied. The sweltering heat and the cramped roof made the highly detailed work difficult, but the team persevered in updating the century-old church.