Azhadi Vineyards was complex and highly detailed building envelope that required advanced logistics and craftsmanship. Flynn’s scope included roof deck assemblies and exterior cladding panels. The 4-foot by 10-foot porcelain panels were sourced from Spain that took two months from fabrication to arrival on site. The main entrance feature—the Iwan—stands as a project highlight and was built with help from TSC to ensure precision.
Total Building Envelope





