The existing building was clad with stucco that contained asbestos. A steel frame was installed over the existing and attached to the main concrete columns. Asbestos abetment was required to access the columns. Alucoil Accumet panels were installed at the column locations and custom fabricated Euramax aluminum panels installed between windows. The roof was replaced again asbestos felts and replaced with TRA and CT board.

27900 SQ. FT. CLADDING

16000 SQ. FT. ROOFING