This project involved the complete tear off and reinstallation of thermally clipped metal roofing system: new vapour barrier, insulation, high temp waterproofing membrane, standing seam metal roofing panels.
We completely replaced the entire metal roofing and glazing systems tied into the roof areas which have been leaking since its original construction. The school has been a high-profile case in the province for the past few years due to the ongoing leaks and water ingress issues.
Flynn was able to come in and work with the needs of the school to keep the school in operation while renovating the roof. We completed the project in 2 phases to work with the school schedule. The new metal roofing system is a hybrid system Flynn helped design to ensure the best possible system for the longevity of the roof system and thermal performance. We utilized a 2-tiered peel and stick membrane system at the top and bottom of the system with 5” insulation and a bearing plate fastening clip that fastened down through the system into the steel deck to create a thermal bridge for high-efficiency energy savings.